| |
|
 |
Designed the facility to meet LEED Silver standards including ultra-low flow water fixtures, roof surface drainage on-grade instead of connecting to the storm drainage system, CO2 monitoring inside the building to optimize air quality and save energy, and full cut-off site lighting to reduce light trespass. |
 |
Implemented Pacific Gas & Electric Savings by Design recommendations including oversizing air handling units and fans by 40% above the typical design (500fpm), duct systems designed for 50% less pressure drop than typical systems, lighting and main power equipment designed to exceed California Title 24 Energy Compliance Standards and daylighting controls for lighting. |
 |
Developed P&IDs and detailed flow diagrams for high pressure steam, process chilled water, lab air flow zoning and pressurization, and direct digital controls (DDC) |