Greene has participated on over 80 projects during the past 10 years. A majority of these projects exceeded $5,000,000 in construction cost.
|
 |
The diversity of our projects with AKT spans a broad spectrum and includes numerous space alterations and process equipment installations. Among other projects, we have been the lead consultants in: the addition of a server room; roof replacement; Process Cooling Water (PCW) and Clean, Dry Air (CDA) systems upgrade; and alterations to their process gas delivery, exhaust and waste water treatment systems. Also prepared several facility systems capacity studies. |
 |
Provide a complete facilities design package with in-house mechanical, electrical and chemical engineering and project management services. Our services for AKT extend beyond the facilities design to supplement their construction project management. Our involvement in the complete process from the planning to the closeout of a project has helped us form a strong link with the entire AKT group. |